La Mesa Dale Elementary School, originally constructed in the mid-20th century, had remained largely unchanged for decades. As part of the La Mesa-Spring Valley School District’s Area 2 Site Improvement initiative, the campus recently underwent a thoughtful transformation aimed at enhancing security, accessibility, and the overall experience for students, families, and staff—while preserving the school’s original character.

StudioWC led the design efforts, beginning with the construction of a new 4,800-square-foot Administration Building that now serves as the main point of entry to campus. The former administrative office was repurposed to support a specialty student services program, maximizing use of existing space.

Improvements to site circulation included the addition of a new entry ramp off Olive Avenue, a regraded and expanded parking lot, and an upgraded drop-off zone to ease congestion and improve safety. A decorative metal fence and gate system was installed, and the new main entry now features an AIPhone system to control access and verify visitors before entry—bringing the school in line with today’s security expectations.

Visually, the campus front was redefined through bold graphic entry panels and a modern, double-sided marquee, creating a strong and welcoming first impression. Environmental upgrades included a new bio basin, bioswales, and shade trees throughout the parking lot to support sustainability and heat mitigation.

Finally, campus-wide safety infrastructure was brought up to modern standards with updated fire and security systems, ensuring La Mesa Dale is equipped for the future.

Through these improvements, the school has been transformed into a safer, more inspiring place to learn and grow. StudioWC’s approach balanced new design with existing charm—creating a campus that supports student success and community connection for years to come.

 

project cost

TBD

total square feet

4,800

timeline

3 yrs