Skip to main content

Testimonials

Even more than their technical expertise, I have to bring attention to their exceptional customer services.  I had the pleasure of working regularly with Rebecca and Debra, and found them engaging, innovative, and always professional. They listened carefully to our ideas, crafted them into working models, and made them a reality. All the while, they kept me grounded and helped me understand the myriad of rules and regulations surrounding new construction. With them I always felt knowledgeable and in the loop of information.

Ted Hooks
Principal, Pepper Drive School / Santee School District

As the Superintendent of a small school district, StudioWC continually supported me as Facilities Manager.  My first call was to Debi and Bob and they were always responsive, helpful, and informative... StudioWC is an outstanding architecture and engineering firm and I highly recommend them for any project -- large or small.

Lindy Delaney
Superintendent (Retired) / Rancho Santa Fe School District

Michelle

...I have had the opportunity to work with Bob and Debra during the planning, design, construction, and closeout of many of [Santee School] District's  projects over the past seven years.  The complexities of this program, as well as the day-to-day challenges were always met with professionalism and hard work by Bob, Debra, and their team.  StudioWC have been great partners and I  look forward to working with StudioWC again in the near future.

Michelle Reiner
Project Executive / Balfour Beatty Construction

I can only recommend StudioWC 200%.

Gerry Devitt
Director of Maintenance, Facilities, Operations and Grounds / Encinitas Union School District

It is without reservation, and with great pleasure, that I recommend this outstanding firm to other organizations.

David Miranda
Executive Director - Facilites Development & Planning / Long Beach Unified School District

StudioWC will be an excellent selection to add to your team!

Katy Wright
Executive Director of Facilities Management / Grossmont Union High School District

I have worked with both Debra Vaughan-Cleff and Robert Webb, and recognize [their] dedication and work ethic to [their] clients.  I would be more than happy to be a reference....

Sandee Hackett
Former Director of Facilities, Maintenance and Operations / Val Verde Unified School District

Bob Webb’s architecture and construction expertise, and Debra Vaughan-Cleff’s project management, civil engineering, and funding expertise, are a perfect match for school design and construction.  We have worked with StudioWC many successful projects.... Their latest project [for our District], Pepper Drive Learning Resource Center, is a beautiful educational space with a design that knocks your socks off and was within budget... As the Director of Facilities and Maintenance for Santee School District, I emphatically and highly recommend StudioWC.

Christina Becker
Former Director of Facilities, Maintenance and Operations / Santee School District

References

Encinitas Union School District | Olivenhain Pioneer Elementary School Energy Upgrades

StudioWC provided architecture and engineering services for energy upgrades at Olivenhain Pioneer Elementary School at EUSD.  The energy improvements included skylights in all rooms, revised lighting switching to A/B, extended canopy overhangs, replacement of all mechanical units, replacement of roofing with cool roofing, a rain water collection system, and a 172 kilowatt AC photovoltaic power system.  The PVs are located in the parking lot and serve as shaded carports, as well as on hard court surfaces to provide shade in play/PE areas.  The mechanical, lighting, and skylight upgrades reduced the utility loads by 25% and the PV is expected to provide 75% of the electrical demand.

Gerry Devitt
Director of Maintenance, Facilities, Operations and Grounds / Encinitas Union School District

Tustin Unified School District | Miscellaneous District-wide Improvements

StudioWC has provided architectural and engineering services for numerous projects throughout the District.  From baseball scoreboards and shade structures, to relocatable buildings, HVAC and minor modernizations, and building additions, we have greatly enjoyed our working relationship with TUSD.  Our most recent project is a brand new 6-12 school still in the planning phase.

Tom Rizzuti
Director | Facilities and Planning / Tustin Unified School District

Alpine Union School District | District-wide Photovoltaic Installations

StudioWC was the Architect of Record and member of the designbuild team for the design and installation of photovoltaics on 4 campuses at AUSD.  The PV panels were mounted onto existing roof structures, and were designed to provide 185 kilowatt AC.

Keith Randhahn
Director of Engineering / Baker Electric Solar

Castaic Union School District and Keppel Union School District | District-wide Photovoltaic Installations

StudioWC is the Architect of Record, and member of the design-build team for the design and installation of photovoltaics on 4 campuses for CUSD and 6 campuses for KUSD.  The PV panels are mounted on elevated structures that serve as carport shade structures, as well as shade structures for hard court surfaces.

Chris DeWitt
Vice President Construction Operations / PSOMAS FMG

Santee School District | District-wide Energy Upgrades including Hill Creek School

StudioWC provided architecture and engineering services for the energy upgrades on 3 campuses at SSD.  The energy improvement included skylights in all classrooms, replaced lighting and revised lighting switching to A/B, replaced windows, replaced existing 4-pipe central mechanical system with high-efficiency combination units, replaced of roofing with cool roofing, and increased insulation.  Hill Creek School also included the addition of a 2-story classroom building and a 175 kilowatt photovoltaic system mounted on elevated structures over hard courts.  The PV structures also provide shade for outdoor classrooms.  There is an energy dashboard for the school, which allows students, parents, and the public to see the impact of the energy upgrades, which can be found here: http://www.buildingdashboard.com/clients/hillcreek/

Christina Becker
Director of Facilities, Maintenance and Operations / Santee School District